At a Glance
-
160KM
Submarine Cable
-
60MW
Increase in Capacity
- Location
- Yellowknife, Northwest Territories
- Offices
-
-
Client
-
-
Government of the NWT
-
- Location
- Yellowknife, Northwest Territories
- Offices
- Client
-
- Government of the NWT
Share
Taltson Hydro Expansion Transmission Route Comparison
To better serve electricity needs in Canada’s remote North, the Government of the Northwest Territories (GNWT) and their partners are proposing to expand hydroelectric generation at the Taltson Twin Gorges station on the Taltson River. This includes a new transmission interconnect between the expanded generation station and the existing Snare Hydro System to the north.
This initiative is a partnership between the GNWT, Akaitcho Dene First Nations, Salt River First Nation, and Northwest Territories Métis Nation. A steering committee of senior leadership from all groups is overseeing the project’s direction and decision-making.
Taking on the challenge of determining how the transmission line would cross Great Slave Lake, the deepest lake in North America, the partners identified two technically viable transmission routes. They engaged us to facilitate comparison of these two routes, building on existing studies, data, and feedback obtained during engagement sessions and Indigenous knowledge workshops.
The first option follows existing transmission lines along a road corridor for most of the route. The second option is shorter and involves a submarine cable across Great Slave Lake with a new overhead alignment. The two routes offer significant differences in length, cost, risk profile, and public perception.?
A key focus for us has been incorporating the perspectives of the project’s Indigenous partners. To that end, we presented data on the potential routes to impacted Indigenous groups and solicited their feedback and knowledge to shape the project’s direction. Additionally, we studied the potential environmental impacts of using submarine cable and methods to mitigate those impacts and considered the employment and business opportunities of each alignment. Based on our presentations and discussions with Indigenous partners, the project is considering the transmission route involving submarine cable across Great Slave Lake and initiating preliminary engineering design. ?
By integrating hydroelectric capacity into one grid, the project will provide a clean energy solution for the mineral-rich region. This streamlined capacity will better meet the needs of mines in the region, increase the overall reliability of the system, and eventually stabilize electricity rates for over 70 percent of the NWT population.?
At a Glance
-
160KM
Submarine Cable
-
60MW
Increase in Capacity
- Location
- Yellowknife, Northwest Territories
- Offices
-
-
Client
-
-
Government of the NWT
-
- Location
- Yellowknife, Northwest Territories
- Offices
- Client
-
- Government of the NWT
Share
Arlen Foster, Principal, Business Center Operations Leader
I enjoy teaming with clients, contractors, and designers to manage risks the arctic brings, producing a product we can all be proud of.
Zo? Morrison, Senior Associate, Planner
I often see my planning role as a translator—we work with everyone to really understand situations and come up with the right solutions.
Reza Ashtari, Team Lead, Transmission Line Engineering
Fascinated by all aspects of power transmission line design and construction, I enjoy designing and optimizing the challenges they present.
My passion is providing clients with thorough, detailed, and clear solutions which consider all aspects of their unique project.
Phaedra Taiarol, Principal, High Voltage Transmission
Power transmission has become integral to society. Integrating renewable energy as we move towards net zero must be done with foresight.
Leslie Greener, Principal, Business Center Practice Leader
The world of power is ever-changing and I’m excited to support my clients, our community, and our world through this energy transition.
Pushpinder Asthir, Independent Contractor
I take pride in guiding teams to deliver energy projects that create lasting benefits for communities.
We’re better together
-
Become a client
Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.
-
Design your career
Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.